Inform all personnel that equipment must be shut down and isolated.
2
Normal equipment shutdown
Use normal stopping procedure to shut down equipment.
3
Operate energy isolation device
Open, close, block, or disconnect all energy sources.
4
Apply lockout devices
Apply personal lock(s) to each energy isolating device.
5
Release stored energy
Release, restrain, or discharge all residual energy.
6
Verify zero energy — Live-Dead-Live
Test known live source → test equipment → retest live source to confirm meter function.
NFPA 70E 130.2(B) · Justified Energized Work
Energized Work Permit
EEWP — Management authorization required
Energized work is only permitted under justified conditions with an approved permit
TIER 2 CONDITION — Safety Director approval required
Incident energy at this equipment meets or exceeds the 12 cal/cm² program ceiling. Energized work requires written approval from the Safety Director before the permit is valid.
NFPA 70E 130.2(B) — Select one
Justification for energized work
1
De-energizing introduces additional or increased hazard
2
De-energizing is infeasible due to equipment design or operational limitations
3
Task requires energized state — diagnostics, testing, or troubleshooting
EEWP Checklist — Under Construction
Detailed permit checklist, approval signature fields, and expiry tracking will be built here.
Scope Change · Alltech ESP
Scope Change
Work scope has changed — document what was performed
Scope Change
Document Scope Change
This will create a new log record linked to your original JSP number.
Original JSP Number
—
Work Performed
Equipment Left In
I confirm that the work described above was performed under the Alltech Electrical Safety Program. The equipment has been left in the condition stated above and all energy controls have been removed or maintained as appropriate.
I acknowledge and confirm the above
✅ Scope Change Logged
Logged as a new record linked to the original JSP number.
Job Safety Plan — Alltech ESP
⛔ ESWC Required
Tier 2 Not Permitted
An Electrically Safe Work Condition is required before work begins.
⚡ Upstream Isolation Point
—
De-energize at the upstream point. Establish LOTO. Verify absence of voltage before work begins.
I understand — ESWC required. I will select a Tier 3 de-energize task to proceed.
ESP Field Resources · Alltech
Other Resources
Control
Reference
Document
Alltech · Electrical Safety Program
ESP Field Access
Enter your QEW ID to access this asset.
Site · Pre-filled
—
QEW ID not found. Contact your Manager.
⏳Verifying access — please wait…
⚠️ 45 min elapsed — close out your JSP
JSP active
Stay within scope and stay safe.
✓ JSP closed — Completion Log updated
JSP Active · Alltech ESP
Work in Progress
Document work performed and close out your JSP
In Progress
JSP Number
Task
Work Performed
● Listening — speak now
Equipment Condition at Close
Out of Service — supervisor notification required
Confirm the tag is physically applied and secured. Notify your supervisor before leaving the area.
I confirm that the work described above was performed under the Alltech Electrical Safety Program. The equipment has been left in the condition stated above and all energy controls have been removed or maintained as appropriate.
I acknowledge and confirm the above
✅ Work Complete — JSP Closed
Logged to the Completion Log and linked to the active JSP.
Loading asset data…
✋
STOP
·
⚡
THINK
·
🔒
ACT
Asset Scanned
—
Logged in:
Admin · —
ADMIN
Field Data · Restricted Access
Admin Access Required
Field Data is restricted to ESP Managers and above.